Analysis of technical needs
Checking the technical requirements of the project
Accurately determining the technical requirements of the project based on the menu and production schedule, including capacity, temperature control accuracy, operation speed, energy efficiency, food contact material (such as stainless steel), and other technical parameters affecting equipment selection.
Determining required technical specifications
Developing a comprehensive and detailed technical specification sheet for each required equipment (from stoves and boilers to sinks and packaging lines) based on project standards and hygiene requirements.
Analysis of operating conditions
Investigate specific operating conditions affecting equipment selection, such as continuous operating pressure, type of raw material (fatty, acidic, etc.), ambient humidity and temperature conditions, and intensive production schedule.