The Holy Shrines of Al-Askariyayn in Samarra

Project Details Summary

An overview of the project's location, executive team, and exact timing to show the actual dimensions of the work
icon
Samarra, Iraq
icon
6 People
Senior Consultant, Designer and Architect, Mechanical Engineer, Electrical Engineer, Supervisor, Instructor and Trainer
icon
2025
icon
۶۰٬۰۰۰ نفر
Services performed in this project
All services are implemented with an engineering approach, controlled and in accordance with health, safety and productivity standards
Training on the Use and Operation of Machinery and Industrial Cooking
Industrial Kitchen Equipment Layout Design
Provision of the Required Equipment List
Industrial Kitchen Plan Design and Facility Installation Layout Drawings Design
Electrical Systems Drawings Design
Supervision of Machinery Installation, Transportation, and Commissioning
Mechanical Systems Drawings Design
Achievements in this project
An overview of the key points in design, execution, and operation that distinguish the project’s quality and efficiency.
Improving Energy Efficiency
Establishing a Sustainable Infrastructure for Development
Improving Food Quality and Safety
Enhancing Operational Efficiency