Shahid Madani Hospital of Tabriz

Development of Hospital Kitchen Based on Green Kitchen Standards

Project Details Summary

An overview of the project's location, executive team, and exact timing to show the actual dimensions of the work
icon
Tabriz
icon
6 People
Senior Consultant, Designer and Architect, Mechanical Engineer, Electrical Engineer, Supervisor, Trainer and Coach
icon
2025
icon
۲٬۰۰۰
Services performed in this project
All services are implemented with an engineering approach, controlled and in accordance with health, safety and productivity standards
Mechanical and Electrical Systems Design
Industrial Kitchen Layout Design
Central Steam System Design
Supervision of Machinery Installation and Commissioning
Design of Facility Layout and Installation Drawings

Achievements in this project

Improving Food Quality and Safety
Enhancing Safety and Hygiene
Increasing Energy Efficiency
Reduction of Environmental Pollutants